L-13 Blanik
Refurbished
Standard specification
Life extension up to 6000 FH per bulletin L13/117a including overhaul
Instruments – „ready to fly"
1x compass
1x airspeed indicator
1x altimeter
1x variometer 5 m/s (ft/min)
without radio, without painting
Price 29,800 EUR
Payment conditions
Option I
1. down payment 500 EUR non-binding order, refundable deposit
Nonguaranteed price, the possibility of increase up to 15%
2. down payment 15% at signing of the contract
3. down payment 15% before painting or assembly of equipment
final payment after test flight
Option II
1. down payment 4000 EUR binding order, irreversible deposit – allocated serial number of the glider
Guaranteed price
2. down payment 15% at signing of the contract
3. down payment 15% before painting or assembly of equipment
final payment after test flight
Painting
Standard painting 4800 EUR
One color fuselage and wings - white/gray/silver 3500 EUR
Each color strip 1000 EUR
Individual color scheme quoted upon request
Optional equipment
Radio KRT 2 1620 EUR
Radio TRIG quoted upon request
Flarm quoted upon request
Upholstery – textile 710 EUR
Upholstery – Alcantara 870 EUR
Upholstery – leather 1130 EUR
Logo embroidered on the upholstery on request quoted upon request
Cobra trailer from 16,980 EUR
The second set of instruments quoted upon request
Parachute ATL 88/90-1 1650 EUR
Tow rope / type I 350 EUR
Tow rope / type II 375 EUR
Fabric cover 240 EUR
Crew compartment cover 350 EUR
Filling device for damper 965 EUR
Anchoring device 219 EUR
Set of tools for maintenance 1499 EUR
Chocks 89 EUR
Basic set of spare parts 1159 EUR
Export certification of airworthiness 300 EUR
Delivery date
2 months after the first down payment
All prices are without VAT, EXW Prague, Incoterms 2011
Offer validity: Until December 31, 2018
L-13 Blanik
Refurbished
See also our other offers in the Pre-owned Gliders section of our website. Click here to get there.
Your
L-13 Blanik
Modified to remove the A.D. and refurbished at the factory
This modification will extend the service life of the L-13 up to 6000 flight hours according to individual conditions.
Price 15,800 EUR
Includes
- modification according to the Mandatory Bulletin L13/117a
- implementation of the bulletins L13/116a and L13/ 107b
- the nearest inspection according to the Maintenance Manual
- check of the instruments
- resealing of the damper and replacement of the control cables (on condition)
- transfer to maintenance system without overhaul
Optional additional work
- replacement or repair of the instruments
- repair or replacement of damaged parts according to technical finding
Optional equipment
- installation of the radio KRT2 or TRIG (8,33 kHz)
- renew of the upholstery
- painting
All prices are without VAT, EXW Prague, Incoterms 2011
Offer Validity: Until December 31, 2018.
L-13 Blanik
Conditions for modification of L-13 Blanik at a FAA-approved U.S. repair facility
This section applies to U.S. based repair facility candidates who are interested
in obtaining the authorization to perform the modification in the U.S.
Factory training and factory-developed repair jigs are mandatory.
The cost of acquiring the repair jigs:
We offer two variants, A or B:
A. Complete set of jigs 45 000 EUR
B. Jigs drawings and a tool jig needed to verify the mounts positions 17 000 EUR
The cost of training of your technician at the Blanik factory
The cost for one person is: 470 EUR. Duration of training: 5 days.
The training covers theoretical as well as hands-on practice. See the detailed description of training in the table below.
According to / Členění dle ATA |
|
Training of your technician at the Blanik factory, description SECTION / SOUSTAVA |
Number of hours / POČET HODIN |
|
|
Introduction / Úvod |
|
05 |
|
Inspections – maintenance / Prohlídky - údržba |
0:30 |
05-00 |
- |
The division of maintenance / Rozdělení údržby |
|
05-10 |
- |
Parts with limited life / Díly s omezenou životnost |
|
05-20 |
- |
Periodical maintenance / Periodická údržba |
|
05-50 |
- |
irregular maintenance / Nepravidelná údržba |
|
|
- |
Maintenance management as per SB & PZZ /Řízení údržby ve vazbě na SB a PZZ |
|
06 |
|
Dimensions and surfaces / Rozměry a plochy |
0:20 |
06-00 |
- |
Dimensions and surfaces /Rozměry a plochy |
|
07 |
|
Lifting and propping up / Zvedání a podepření |
0:10 |
07-00 |
- |
Lifting principals, placing supports / Zásady při zvedání, umístění podpěr |
|
08 |
|
Levelling and weighing / Nivelování a vážení |
0:30 |
08-00 |
- |
General principals / Všeobecné zásady |
|
08-10 |
- |
Weighing and balancing / Vážení centráž |
|
08-20 |
- |
Levelling / Nivelace |
|
09 |
|
Towing – taxiing / Vlečení - pojíždění |
0:10 |
09-10 |
- |
Towing /Vlečení |
|
10 |
|
Parking – anchoring / Parkování - kotvení |
0:10 |
10-10 |
- |
Parking / Parkování |
|
10-20 |
- |
Anchoring / Kotvení |
|
11 |
|
Markings and placards / Nápisy a štítky |
0:20 |
11-20 |
- |
External markings and placards / Vnější popisy a štítkování |
|
11-30 |
- |
Internal markings and placards / Vnitřní popisy a štítkování |
|
12 |
|
Servicing / Obsluha |
0:30 |
12-00 |
- |
General information / Všeobecné informace |
|
12-10 |
- |
Adding technical gases / Doplňování technických plynů |
|
12-20 |
- |
Prescribed maintenance, planned servicing / Předepsaná údržba, plánovaná obsluha |
|
12-30 |
- |
Non-standard maintenance and servicing – general /Nestandardní údržba, neplánovaná obsluha - všeobecně |
|
20 |
|
Standard procedures / Standardní postupy |
2:00 |
20-00 |
- |
General information / Všeobecné informace |
|
20-10 |
- |
Test flight requirements / Zalétaní, požadavky na provedení |
|
20-20 |
- |
Repair technology requirements / Opravy, požadavky na opravy, technologie oprav |
|
20-30 |
- |
Spare parts storage requirements / Základní požadavky-skladovací podmínky náhradních dílů |
|
21 |
|
Ventilation / Klimatizace |
0:10 |
21-00 |
- |
Cockpit ventilation / Větrání pilotní kabiny |
|
23 |
|
Communication / Komunikace |
0:30 |
23-00 |
- |
General – radio, electrical, control / Všeobecná část, radiostanice, napájení, ovládání |
|
23-60 |
- |
Grounding static electricity, inspection / Statická elektřina, přemostění, uzemění, kontrola propojení |
|
24 |
|
Electrical system / Elektrická soustava |
0:40 |
24-00 |
- |
General – electrical connections / Všeobecně - systém napájení |
|
24-30 |
- |
Sources of electrical feeds, maintenance / Zdroje napájení, údržba |
|
24-50 |
- |
Electrical energy distribution / Rozvod elektrické energie |
|
25 |
|
Internal equipment and emergency / Vnitřní vybavení, nouzové prostředky |
0:30 |
25-10 |
- |
Cockpit equipment / Vybavení pilotní kabiny |
|
25-60 |
- |
Emergency means – ELT / Nouzové prostředky - ELT |
|
27 |
|
Flight control / Řízení letu |
2:30 |
27-00 |
- |
General – flight controls / Všeobecně-soustava systému řízení letu |
|
27-10 |
- |
Banking control – ailerons system, basic maintenance / Příčné řízení – křidýlka, systém, ovládání, základní údržba |
|
27-20 |
- |
Directional control – rudder, basic maintenance / Směrové řízení – směrovka, systém,ovládání, základní údržba |
|
27-30 |
- |
Elevator and trim controls, basic maintenance /Podélné řízení - výškovka a fletner výškovky, systém, ovládání, základní údržba |
|
27-60 |
- |
Air brakes control, basic maintenance / Brzdící klapky - systém, ovládání, základní údržba |
|
According to / Členění dle ATA |
|
SECTION / SOUSTAVA |
Number of hours / POČET HODIN |
31 |
|
Instruments and recording devices / Indikace a záznamové zařízení |
0:30 |
31-00 |
- |
General / Všeobecně |
|
31-10 |
- |
Instrument and control panels / Přístrojové desky a ovládací panely |
|
31-30 |
- |
Recording accelerometer / Záznamový akcelerometr |
|
32 |
|
Landing gear / Přistávací zařízení |
1:00 |
32-00 |
- |
General, suspension, play, basic maintenace / Všeobecně, uložení, vůle, základní údržba |
|
32-10 |
- |
Main landing gear / Hlavní podvozek |
|
32-30 |
- |
Landing gear retraction and extension / Zasouvání - vysouvání podvozku |
|
32-40 |
- |
Wheels and brakes / Kola a brzdy |
|
32-60 |
- |
Main landing gear position indicator / Ukazatel polohy hlavního podvozku |
|
32-70 |
- |
Supplementary undercarriage / Přídavný podvozek |
|
34 |
|
Flight and navigation instruments / Navigace, přístroje pro kontrolu letu |
1:00 |
34-00 |
- |
General / Všeobecně |
|
34-10 |
- |
Pitostatic and compensated pressure system / Soustava celkového, statického a kompenzovaného tlaku |
|
34-20 |
- |
Directional and position instruments / Přístroje pro určení polohy a směru |
|
35 |
|
Oxygen equipment / Kyslíkové vybavení |
0:10 |
35-10 |
- |
Oxygen equipment for crew / Kyslíkové vybavení pro posádku |
|
52 |
|
Canopy / Dveře |
0:20 |
52-10 |
- |
Cockpit canopy cover(s) / Kryty pilotní kabiny |
|
52-40 |
- |
Service access covers / Kryty, víčka pro obsluhu |
|
53 |
|
Fuselage / Trup |
1:00 |
53-00 |
- |
General / Všeobecně |
|
53-10 |
- |
Fuselage structure / Konstrukce trupu |
|
53-30 |
- |
Fuselage skins / Potah trupu |
|
53-40 |
- |
Mounts for towing / Závěsy, vlečné zařízení |
|
55 |
|
Tail surfaces / Ocasní plochy |
1:00 |
55-00 |
- |
General, assembly and disassembly / Všeobecně + montáž a demontáž |
|
55-10 |
- |
Horizontal stabilizer / Horizontální stabilizátor |
|
55-20 |
- |
Elevator / Výškové kormidlo |
|
55-30 |
- |
Vertical stabilizer / Vertikální stabilizátor |
|
55-40 |
- |
Rudder / Směrové kormidlo |
|
56 |
|
Windows / Okna |
0:10 |
56-00 |
- |
General / Všeobecně |
|
56-10 |
- |
Cockpit cover glazing / Zasklení kabiny posádky |
|
57 |
|
Wings / Křídla |
1:30 |
57-00 |
- |
General, assembly and disassembly / Všeobecně + montáž a demontáž |
|
57-10 |
- |
Inboard wing structure / Konstrukce střední části křídla |
|
57-30 |
- |
Outboard wing structure, wing tips and extensions / Konec křídla - koncový oblouk, koncové nástavce |
|
57-40 |
- |
Wing leading edge / Náběžná hrana křídla |
|
57-50 |
- |
Winag trailing edge / Odtoková hrana |
|
57-60 |
- |
Ailerons / Křidýlka |
|
57-70 |
- |
Air brakes / Spoilery - brzdící klapky |
|
|
|
General familiarization with the Flight Manual / Základní seznámení s Letovou příručkou |
0:20 |
The above table may be sent to you. Ask for the file <type_training_eng&cz.PDF>.
Following
the factory training of your technician, it is possible to send a
Blanik factory technician to your facility (for example, for one month)
who would initially work with your technicians and show them the proper
techniques. This, however, would not be a substitute for the initial
training of your technician at the Blanik factory. The factory would
charge for the cost of the factory technician depending on your
interest and the duration of his stay at your facility, after a prior
agreement.
The cost of material needed for one glider.
The cost of one (1) set 9,852 EUR (EXW Prague, Czech Republic)
The number of manhours needed to modify one glider.
The
basic modification requires up to 200 manhours per glider. However, our
experience has been that often other service bulletins need to be
performed in addition to the actual modification (if not yet done, for
example, the bulletin L13/108a). Also often other needed repairs need
to be done, which increases the overall needed amount of labor.
A timetable when the training at the factory could take place.
The earliest available date for training is from the beginning of August 2018.
To help you get an idea of what repair jigs would be needed, we can send you
< AMOC_1.1presentation.PDF>. The AMOC (Alternative Method of Compliance) has been approved by the FAA.
All prices are without VAT, EXW Prague, Incoterms 2011
Offer Validity: Until 31 December 2018
There are over one hundred ninety L-13 Blaniks in North America!
NEWS
In July 2017, the FAA approved the modification to lift the grounding of L-13 Blaniks.
Click here for details.
Reference: Global AMOC (Alternative Method of Compliance), Airworthiness Directive (AD) 2010-18-05, FAA Directorate Identification Number 2010-CE-042-AD, Docket Number FAA-2010-0839.
We also suggest that you read this article
(The right answer for Blanik reinforcement in the US market)
The original L-13 BLANIK was built by the LET factory in 1958. Since then almost L-13s were made, and many of them are still flying all over the world. The two-seat, all-metal L-13 became very popular due its durability, reliability, and ease of handling.
The L-13 Blanik is Type-Certified in most countries of the world.Wing span 53.1 ft
Length 27.9 ft
Height 6.2 ft
Wing area 206.1 sft
Max. weight 1100 lbs
Never exceed speed 136 kts
Rough air speed 76 kts
Aero tow speed max. 76 kts
Winch speed max. 65 kts
Stall speed at max. weight 32 kts
G-limits with 2 pilots +5.3/-2.65
G-limits with 1 pilot +6.0/-3.0
Max. glide ratio 2 pilots 28:1 at 49 kts, 1 pilot 28:1 at 43 kts
Min. rate of sink 160 fpm at 37 kts
Available equipment and accessories are: front aerotow and center of gravity winch hooks, 4-point seat belts, seat cushions, special seat back rests, extra seat with 33 lb ballast, one-piece canopy, cockpit cover, pitot cover, set of spare parts, flight manual, maintenance manual, spare parts catalogue, levelling and rigging record, weight and balance record.
Additional options are: White color all over with optional red stripes, winglets, wing installation drift pin, control locks and ground anchors, winch tow rope, wing tie-down rings, spart parts tool kit, strut charger, spare parts catalog. Also available as options are G-meter, 35,000' altimeter, radio and installation, special upholstery, center of gravity bottom winch tow hook, strut seal kit, covers for the entire glider, and custom paint ornamentation.FUSELAGE
The fuselage is of semi-monocoque construction with longerons and
bulkheads, oval in cross-section. The cockpit is covered with a
one-part plexiglass canopy. The rear fuselage is made of two stiffened
semi-monocoque
structures and reinforcing bulkheads riveted together.
WINGS
The trapezoid-shaped wing with a negative sweep is of all-metal,
single-spar construction. Each wing half is connected to the
fuselage by means of a vertical main spar pin and a horizontal
front spar pin. Flaps and ailerons are of metal structure, fabric-covered. The spoilers
extend both above and below the wing, and hook up automatically.
TAIL
The horizontal stabilizers of all-metal construction attach to
the fuselage at the base. The elevators area of metal frame covered
with fabric, and each has a trim tab. The elevator and tabs
hook up automatically upon assembly. The rudder's metal frame is
fabric-covered and attaches to the all-metal fin on two mounts.
FLIGHT CONTROLS
The control sticks actuate the elevator and ailerons via a system
of levers and rods. The adjustable rudder pedals are connected to
the rudder by cables. The elevator is aerodynamically trimmed. A
system of levers and torsion rods extends and retracts the
spoilers. The L-13 is equipped with a front aerotow hook and side
winch/auto tow hooks. A custom, bottom center of gravity tow hook
may be built in. Both tow releases are controlled by handles on
the instrument panels.
LANDING GEAR
The landing gear consists of a semi-retractable single wheel,
equipped with a drum brake, and sprung by a well-proven
oleo-pneumatic shock absorber. The front bottom of the fuselage
has a protective steel shoe. The reinforced, fully-swiveling,
solid rubber tail wheel has a rubber shock absorber. Optionally,
a tail skid may be installed.
COCKPIT
The cockpit can accomodate pilots 5'1" to 6'8" tall.
The four-point seat belts protect the pilots along with
upholstered seats. Two full sets of
instruments may be installed. The variometers are attached to the
total energy probe mounted in the front. Fresh air can be let in
the cockpit either through the front fuselage vent or through
sliding window scoops.
The L-13 is a very enjoyable glider to fly. The take-off roll is smooth even on rough ground thanks to a very effective shock absorber on the main wheel. On tow, the aircraft is very stable and can be flown hands-off when trimmed with the responsive and easy to adjust elevator trim. The controls are accurately tuned and balanced, and move lightly with little friction. The fore-and-aft stability is excellent with no tendency to over-pitching. The lateral handling is very effective with a roll rate of 4 seconds from 45° to 45° at near the best glide speed. The airbrakes are effective and gradual in application. Side-slipping is excellent.
On the ground the glider is very easily maneuverable thanks to the swivelling tail wheel and optional wing tip wheels. If tail lifting is required to move the tail over especially rough ground, the tail may be handled by inserting a bar just ahead of the vertical fin. The one-piece canopy closes and opens from either seat.
History
In
2010, the FAA grounded the operation of L-13 Blaniks. In July 2017, the
FAA approved the modification to lift the grounding of L-13 Blaniks.
Reference: Global AMOC (Alternative Method of Compliance), Airworthiness Directive (AD) 2010-18-05, FAA Directorate Identification Number 2010-CE-042-AD, Docket Number FAA-2010-0839. Click here for details.